Fablog provided Hisense Group with diagnosis services of plant production logistics, line feeding logistics and internal warehouse, and proposed potential optimization points and improvement suggestions
Fablog did some system diagnosis on logistics problem in Harbin factory Through data analysis and process adjustment, Fablog redesigned the machine processing zone of Harbin factory, optimized material flow and logistics equipment
Fablog team completed sinotruck commercial vehicle plant site investigation work and finished the conceptual scheme after analyzing the capacity data, inventory data provided in the security, quality, stimulating, response and cost principle
Through the optimization of original materials library, semi-finished materials library, production and processing workshop material layout and working distribution, Fablog optimized the cost, standardized operation and enhanced the efficiency of the operation。